Automated Control Line Clamping
Our patent-pending Control Line Clamping System is in development.
The control line handling system with guide arm and banana sheaves are now in operation offshore Clamp prototypes have been tested for regulation compliance and are in development.
The pictures are from the workshop testing. A more compact skid-based solution for use on drillfloor is also under development.
The automated system has the following benefits:
- No personnel in red zone on drill floor
- Quicker installation of clamp saves valuable rig time.
- No pre-installed equipment on the production tubing
- Simple and sturdy design suited for automation
- Complies with Equinor TR-2385 “Well Completion Equipment”.
For more information on this system, please get in touch with us!